Algoma resumes electric arc furnace production after unplanned power outage

News Room
By News Room 1 Min Read

SAULT STE. MARIE – Algoma Steel Group Inc. says it has resumed electric arc furnace production after an unplanned outage at its Lake Superior Power generating facility.

The company says the LSP turbine remains unavailable, but it has worked with the Independent Electricity System Operator to implement interim operating arrangements.



Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *