The memo detailed a list of necessary restoration jobs, including new sprung stage floors in both theatres, updates and repairs to the orchestra pit, restoration of audience seating, electrical upgrades, floor-tile installation, drywall replacement, painting and other general repairs. The damaged stage gear will also be replaced.